重囗味另类老妇,亚洲亚洲人成综合网络,女人色极品影院,麻豆精产三产最简单处理方法,黑人糟蹋人妻HD中文字幕,久久人妻精品白浆国产,激情偷乱人成视频在线观看,荫蒂添的喷水A片视频小说,亚洲日本无码一区二区三区四区卡,强行糟蹋人妻HD中文字幕

Wafangdian Guangyang Bearing Group Co., Ltd.

Home >> Industry News

Contact Us

Tel:400-0058-999
Add:No. 2200, Section 3, South Street,Wafangdian City, Liaoning Province, China
Tel:0411-85647733
Fax:0411-85647666
Website:www.m.cqcq12.cn

Industry News

Report Shows New Transmission Can Help Wind Energy Supply a Third of U.S. Electricity

Release Time:10 Jan,2017

The Energy Department released a report which confirms that adding even limited electricity transmission can significantly reduce the costs of expanding wind energy to supply 35% of U.S. electricity by 2050. The report, titled Reducing Wind Curtailment through Transmission Expansion in a Wind Vision Future and authored by the National Renewable Energy Laboratory (NREL), affirms the findings of the Energy Department’s 2015 Wind Vision, which showed that a future in which wind provides 20% of U.S. electricity in 2030 and 35% in 2050 is achievable and would provide significant economic, energy security, and health benefits to the nation. For the study, NREL simulated operation of the electric power grid under a scenario where 35% of electricity comes from wind in the year 2050 using PLEXOS, an integrated modeling tool commonly used by utilities and transmission organizations. The study focuses on the Western Interconnection grid, which includes 11 states, two Canadian provinces, and parts of northern Mexico where the U.S. grid crosses the border. The study includes a baseline scenario assuming no significant transmission expansion across the western grid, as well as three scenarios with varying levels of transmission buildout. In the baseline scenario with no transmission expansion, substantial renewable energy curtailment—times in which wind farm operators are told not to produce energy due to limited capacity on the grid—could become a major issue. In this scenario, about 15.5% of wind energy capacity goes unused with consequent increases in system costs as a result of idled wind generation. The study also finds that if just four currently proposed transmission projects are built, wind curtailment can be reduced by about half, cutting lost generating potential to 7.8%. If the nation deploys additional transmission beyond those four proposed projects, wind curtailment can be reduced even further—allowing full use of wind energy, reducing generation costs, and unleashing additional economic and societal benefits. This report quantifies on a regional scale what we’ve seen happen in Texas in recent years; wind curtailment on Texas’s grid ranged from 8% to 17% between 2009 and 2011, but fell to only 1% after new transmission lines and other upgrades were completed under Texas’s Competitive Renewable Energy Zone initiative. Wind power is one of the fastest growing sources of new electricity generation in the United States and is already providing substantial economic, energy security, and health benefits. This study affirms that even limited additions to transmission capacity would allow more wind energy from the Mountain States to power load centers on the West Coast. On the other hand, a lack of new transmission capacity could limit the growth of wind energy and its potential benefits. Overall, the results of the study underline that utility grids can reliably operate with more than 35% wind energy and 12% solar energy, and emphasize that even limited transmission expansion can significantly ease the path to a renewable energy future.
|
Quick links
Follow Us

Mobile Website

Wechat Platform

GroupMore

Wafangdian Guangyang
Bearing Group Co., Ltd.

Equipment & Capability

Copyright@2017Wafangdian Guangyang Bearing Group Co., Ltd.

主站蜘蛛池模板: 岳普湖县| 沙雅县| 义乌市| 侯马市| 永修县| 成安县| 门源| 错那县| 九龙县| 乌拉特前旗| 通渭县| 宁乡县| 安义县| 陆良县| 望奎县| 凤冈县| 托克托县| 龙川县| 佛坪县| 明光市| 水城县| 汉源县| 化隆| 定西市| 沁源县| 通州市| 醴陵市| 仪征市| 景德镇市| 白河县| 礼泉县| 兴化市| 丘北县| 五华县| 禹城市| 阳江市| 溧水县| 时尚| 清河县| 白玉县| 府谷县|